You are here: Dan's photos > Things > Making > Patio > DSCN9743

DSCN9743

View Full Size Image [+]

Description:
First, dig your hole. We went down 8 inches, which takes us just to the top of the clay layer. (fortunately, as the the digging would be much harder down there).

Don't forget to try and make the hole slope gently away from the house, to keep the drainage working the right way.
DSCN9743 DSCN9746

Thumbnails    Next

All rights reserved. Images may not be reproduced in any form without the express written permission of the copyright holder.
Powered by singapore | Log in